Eredi Gnutti Metalli Spa

07th of December 2016.

E.G.M. Spa. has commissioned to Gruppo Felappi the full realization of electrical system for the whole packaging line including shear completed with power line low voltage, power center, the distribution and on board machine electrical system.

 

Eredi Gnutti Metalli Spa

07th of December 2016.

E.G.M. Spa has commissioned to Gruppo Felappi the full realization of electrical system for the new Tensio levelling line from medium voltage on board machine including the distribution of power electrical control panels.

 

Eredi Gnutti Metalli Spa

07th of December 2016.

E.G.M. spa has commissioned to Gruppo Felappi the full realization of electrical system for the new rolling line (rolling mill for copper) from medium voltage on board machine including the distribution of power electric control panels.